Day 28: The plane is now being put back together. All linkages and cables have been reconnected. Only the engine re-install remains and it is time to test fly it again.
Day 26: All surface finishing around wing cutout and turtle deck have been completed as well as about 12 other blemishes that I was not happy with on other areas of the plane.
Day 19: Aft wing is bonded back in place with the new angle.
The turtle deck above the wing has been modified and is back in place. Surface finishing of all areas around the wing cutout have to now be completed. The drive tubes for the ailerons have been adjusted in length as a result of this wing modification.